DVOR 432
Installation
10 ft Container Shelter
Concrete foundation
Lead through used
for DVOR antenna
connections
Wiring Diagram of electrical Installation
option box
Main Fuse
switch
*
L1
L2
L3
Residual
Current Breaker
N
a I>
FI1
PE
Overvoltage
Protection
BCPS
TX Rack
DME
etc.
20 protected wires
-
Signal lines
90 V/Type F
NF 600 OHM
Line Terminal Box
Fig. 2-6
Standard shelter, ground plan and electrical installation DVOR (example)
2-6
Â
Â
Ventilation of battery box
40
0.03
B10A
B18A
C20A
F4
F3
4
3
1
BCPS
. . . .
. . . .
ASU
. . . .
Inside Light
Socket outlets
-
+
Emergency battery
48 V
Operation and Maintenance
Battery Box
Main Distribution Panel
C20A
C20A
F2
F1
F5
2
5
Spare
optional
+
48 V
-
A/C1
A/C2
TX
DME
Air-Conditioner
Single Phase "Option"
-
+
48 V
DME
if available
* Example diagram for Mains Supply with 3 Phases, N and PE
Air Conditioner (option)
Location of Navaids 400 cabinets
(DVOR, ASU, DME)
C20A
F6
F7
F8
change o.
6
7
8
9
. .
optional
θ
junction box
set to
heater
36 °C
Temp.
Sensor
twilight
obstruction light
switch
antenna
Ed. 01.04
F9
10