Setup/commissioning
18/50
2.2
Commissioning
WARNING!
Damage to device possible!
Where there are great differences in temperature between
the transport route and the installation site the device may
not be put into operation immediately after being set up.
–
Wait at least 2 hours before connecting the device to
the power supply.
–
Plug in the device's power plug.
The device is ready for operation.