Scope Of Delivery; Transport And Setup - BEAUTY ANGEL ELT2 Operating Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

Safety instructions and warnings
8/50
1.4.3

Scope of delivery

Information regarding the scope of delivery is contained in the 'Description'
chapter on page 19.
1.4.4

Transport and setup

The device is delivered by a specialist company. The specialist company is
responsible for the installation and connection as part of its work. A socket
with earthing contact must be provided by the customer near to where the
device is set up.
As the operator you are responsible for complying with the electrical require-
ments at the installation site.
NOTICE:
The electrical connection must comply with national regula-
tions.
The device is connected with a mains power cable.
See Setup/commissioning page 17.
Setup location
DANGER!
Risk of injury!
The strapping tapes are under tension.
Cut the strapping tapes open carefully.
WARNING!
Damage to device possible!
Where there are great differences in temperature between
the transport route and the installation site the device may
not be put into operation immediately after being set up.
Wait at least 2 hours before connecting the device to
the power supply.
WARNING!
Risk of overheating due to air flow problems!
Operating faults possible.
Do not change, obstruct or block the air inflow and
outflow area to the device or make any unauthorized
changes to the device. The manufacturer shall bear no
liability for damage or injuries resulting from such ac-
tions.
Environmental conditions
Optimum ambient temperature: Between 20 °C and 35 °C
Storage temperature: Between -15 °C and +60 °C

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Elt3

Table of Contents