Field power wiring is connected from the main control panel
in the RFS unit to powerblock (PB4) or an optional disconnect
switch (DS4) located in the condenser control panel of the RCS
unit. Power leads enter the bottom left corner of the condenser
control panel through the conduit hubs shipped with the unit.
Refer to
Figure
50.
Figure 49: Typical Power Wire Entrance, Unit View—RPS 045D to 140D Shown (Actual Opening Shown on Submittal
Documents)