Daikin RDT Installation And Maintenance Manual page 27

Table of Contents

Advertisement

Phase II . Reassemble cabinet (Figure 31)
1. Reinstall top cap removed in Phase I, Step 1.
2. Caulk (watertight) ends of splice cap.
3. Caulk (watertight) vertical seam.
4. Install #10 screws (provided).
5. Install screws (0.25–20 × 0.75) removed in Phase I,
Step 2
6. Install splice cover (provided).
Figure 32: Reassemble Cabinet
www.DaikinApplied.com
Caulk
vertical
seam
See detail
27
M
Reinstall top cap
saved in step 1
Caulk ends
of splice cap
Install screws
(.25 to 20 × .75)
saved from step 1
IM 893-10 • ROOFPAK SINGLEZONE UNITS
I
eChanICal
nsTallaTIon
Splice cover,
provided
#10 screws,
provided
Nut clip-on,
provided

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

RpsRfsRcs 015dRcs 140d

Table of Contents