1
ABOUT THIS DOCUMENT
1
About this document
1.1
Scope
1.2
Target groups and structure of these operating instructions
6
O P E R A T I N G I N S T R U C T I O N S | deTec2 Core
These operating instructions contain information required during the life cycle of the
safety light curtain.
These operating instructions are available to all those who work with the safety light
curtain.
Please read these operating instructions carefully and make sure that you understand
the content fully before working with the safety light curtain.
These operating instructions only apply to the deTec2 Core safety light curtain with the
following type label entry Operating Instructions: 8014274.
These operating instructions are included with SICK part number 8014274 (all availa‐
ble languages).
These operating instructions are intended for the following target groups: project devel‐
opers (planners, developers, designers), installers, electricians, operators and mainte‐
nance personnel.
The structure of these operating instructions is based on the life cycle phases of the
safety light curtain: project planning, mounting, electrical installation, commissioning,
operation and maintenance.
In many applications, the audiences are assigned as follows to the manufacturer and
organization operating the machine, in which the safety light curtain is integrated:
Area of responsibility
Target group
Manufacturer
Project developers
(planners, developers,
designers)
Installers
Electricians
operating company
Operator
Maintenance person‐
nel
1)
Chapters not listed here are intended for all target groups. All target groups must take into account the
safety and warning instructions of the complete operating instructions!
In other applications, the operating organization is also the manufacturer of the equip‐
ment with the corresponding allocation of the target groups.
Special chapters of these operating instruc‐
tions
1)
"Project planning", Page 15
"Technical data", Page 47
"Accessories", Page 53
"Mounting", Page 24
"Initial commissioning", Page 35
"Checklist for initial commissioning and com‐
missioning", Page 64
"Electrical installation", Page 33
"Operation", Page 39
"Troubleshooting", Page 44
"Maintenance", Page 42
"Troubleshooting", Page 44
"Ordering information", Page 52
8014276/2014-02-18 | SICK
Subject to change without notice
Need help?
Do you have a question about the deTec2 Core and is the answer not in the manual?