Verifying The End-To-End Path - Paradyne iMarc SLV9128 Installation Instructions Manual

Network access module (nam)
Hide thumbs Also See for iMarc SLV9128:
Table of Contents

Advertisement

Verifying the End-to-End Path

After installation of a remote site unit, run an IP Ping test to ping the NMS at the central
site and verify that the entire path from the remote unit to the NMS is functioning. To run
the IP Ping test, NMS trap managers must have been configured for the remote unit.
One of those trap managers must be the central site NMS.
Procedure
1. Select the IP Ping test.
Main Menu → Test → IP Ping
2. Enter the IP Address of the device being pinged, then select Start.
NOTE:
When running tests, the cursor is positioned over the Start command. Press
Enter to start the test. Stop is displayed while the test is running. Press Enter
again to issue the Stop command.
— While the test is running, In Progress... appears in the Status field.
— When the test is finished, Alive. Latency = nn ms should appear as the
Status (nn being the amount of time the test took in milliseconds).
If any other message is displayed, additional testing will be required. See the
iMarc SLV Operations Guide for information about IP Ping-related messages.
23

Advertisement

Table of Contents
loading

Table of Contents