Completing Setup of the Unit From the NOC
Procedure
1. Access the remote iMarc unit using the dedicated management link, using the Node
IP Address that was entered (see
Remote Access
2. Configure specific frame relay options, like CIR (committed information rate), and
any other configuration options requiring input or changes from the default settings.
3. Configure each interface according to the local management interface (LMI) and
assigned line conditions supplied by the service provider.
Configuration → Network → Frame Relay
Configuration → Data Ports → Frame Relay
4. If SNMP traps are wanted, set up managers, select the desired traps, and configure
trap dial-out if desired (see
page 21).
5. Set up the modem and, if trap dial-out is desired, the Call Directories (see
Up the Modem
6. If the unit is equipped with an ISDN DBM, set up the DBM (see
DBM
on page 19).
7. Save the configurations.
8. Verify the entire path from the remote unit to the NOC NMS is functioning (see
Verifying the End-to-End Path
9. Verify that data is being received (see
page 27).
10. Verify that all PVCs, including Management PVCs, are configured; and see whether
the PVC is active or not (see
11. Verify the setup for backup, if applicable (see
Data Can Be Passed Between DBMs
The iMarc installation is complete.
on page 14).
Configuring SNMP Trap Managers and Trap Dial-Out
on page 17).
on page 23).
Checking PVC Connections
Physically Installing the Unit and Setting Up for
Verifying That Data is Being Received
Verifying the ISDN Line and That
on page 29).
15
Setting
Setting Up the ISDN
on page 28).
on
on

Advertisement

Table of Contents
loading

Table of Contents