Location And Orientation - Emerson Rosemount 585 Annubar Quick Installation Manual

Flanged flo-tap 585 annubar
Hide thumbs Also See for Rosemount 585 Annubar:
Table of Contents

Advertisement

Flanged Flo-Tap 585 Annubar
S
1: L
TEP
OCATION AND
Correct orientation and straight run requirements must be met for accurate and repeatable
flow measurements. Refer to Table 1 for minimum pipe diameter distances from upstream
disturbances.
Table 1. Straight Run Requirements
1
2
3
4
O
RIENTATION
Upstream Dimensions
Without
Straightening
Vanes
In
Out of
Plane A
Plane A
A
A
8
10
11
16
23
28
Quick Installation Guide
00825-0200-4585, Rev AA
With
Straightening
Vanes
A'
C
C'
4
8
4
4
4
4
8
4
4
4
4
8
4
4
4
January 2009

Advertisement

Table of Contents
loading

Table of Contents