Removing The Chassis From A Rack - Cisco UCS 5108 Installation Manual

Chassis
Hide thumbs Also See for UCS 5108:
Table of Contents

Advertisement

Installation

Removing the Chassis from a Rack

Procedure
Step 1
Use Cisco UCS Manager to do the following:
a) Shut down the OS on all blade servers in the chassis.
b) Disable the Smart Call Home feature.
c) Decommission the chassis.
ports on the fabric interconnect, the expansion modules are never used for direct chassis connections,
they are used for uplink or SAN connections.
Figure 38: Proper Connection for the Server Chassis and two Cisco UCS 6120XP Fabric Interconnects
Removing the Chassis from a Rack
Cisco UCS 5108 Server Chassis Installation Guide
61

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents