Powering O N The System; Verifying Proper Operation - Foundry Networks FES2402 Installation Manual

Fastiron compact switch
Hide thumbs Also See for FES2402:
Table of Contents

Advertisement

Figure 3.3
Installing the Device in a Rack
4.
Proceed to "Powering On the System" on page 3-9.
Powering On the System
After you complete the physical installation of the system, you can power on the system.
1.
Ensure that all power supplies are fully and properly inserted and no power supply slots are uncovered.
CAUTION: Never leave tools inside the device.
2.
Remove the power cord from the shipping package.
3.
Attach the AC power cable to the AC connector on the rear panel.
4.
Insert the power cable plug into a 115V/120V outlet.
NOTE: To turn the system off, simply unplug the power cord(s).
NOTE: The socket should be installed near the equipment and should be easily accessible.
NOTE: If the outlet is not rated 115/120V, stop and get the appropriate cable for the outlet.

Verifying Proper Operation

After you have installed any redundant power supplies, verify that the device is working properly by plugging it into
a power source and verifying that it passes its self test.
If your device has more than one power supply installed, repeat this procedure for each power supply.
1.
Connect the power cord supplied with the device to the power connector on the power supply on the rear of
the device.
December 2008
5
3
6
1
4
2
ct
Lin k/A
12
FD X
11
9 10
7 8
Po we
r
6
5
2 3
4
ER
PO W
1
PS 1
25 C
PS 2
OL E
CO NS
26 C
26 F
25 F
LIN K
AC T
© 2008 Foundry Networks, Inc.
Installing a FastIron Compact Switch
24
23
21 22
19 20
11
18
16
17
14 15
9
13
12
7
10
8
3 - 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents