Wall Mount Installation

1.
To mount the device on a wall, you must order and install the Wall Mount Bracket kit (part number 70076-
000). Follow the instructions included in the kit to mount the device on a wall.
2.
Proceed to "Powering On the System" on page 3-9.
Powering On the System
After you complete the physical installation of the system, you can power on the system.
1.
Ensure that all power supplies are fully and properly inserted and no power supply slots are uncovered.
CAUTION: Never leave tools inside the device.
2.
Remove the power cord from the shipping package.
3.
Attach the AC power cable to the AC connector on the rear panel.
4.
Insert the power cable plug into a 115V/120V outlet.
NOTE: To turn the system off, simply unplug the power cord(s).
NOTE: The socket should be installed near the equipment and should be easily accessible.
NOTE: If the outlet is not rated 115/120V, stop and get the appropriate cable for the outlet.

Verifying Proper Operation

After you have installed any redundant power supplies, verify that the device is working properly by plugging it into
a power source and verifying that it passes its self test.
If your device has more than one power supply installed, repeat this procedure for each power supply.
1.
Connect the power cord supplied with the device to the power connector on the power supply on the rear of
the device.
2.
Insert the other end into a properly grounded electrical outlet.
3.
For the FES2402-POE and FES4802-POE with power supply model RPS8, turn the power switch to the ON
position.
NOTE: The non-POE devices use power supply model RPS5, which do not have power switches. They
power on when you connect a power cord to the device and to a power source.
If your installation requires a different power cord than that supplied with the device, make sure you obtain a
power cord displaying the mark of the safety agency that defines the regulations for power cords in your
country. The mark is your assurance that the power cord can be used safely with the device.
4.
Verify that the LED for each power supply is a solid green.
5.
Verify proper operation by observing the LEDs:
All the port LEDs should flash momentarily, usually in sequence, while the device performs diagnostics. After
the diagnostics are complete, the LEDs will be dark except for the ones that are attached by cables to other
devices. If the links on these cables are good and the connected device is powered on, the link LEDs will
light.
For more details on specific LED conditions after system start-up, see the section below, "Observing the
June 2006
© 2006 Foundry Networks, Inc.
Installing a FastIron Stackable Switch
3 - 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents