Download Print this page

Hisense AS-07HR4SYDDEB Service Manual page 5

Advertisement

2
.
INSTALLATION
2
.
INSTALLATION
Note: The installation template should be installed level.
2.3. Drilling:
Note:The tool need to raise 5 degrees when drilling, so that the hole of the
indoor side will be higher than the outdoor side, the water can drain smoothly.
2.4 Bend the evaporator pipe:
Note: When you bend the evaporator pipe, you should use your right hand
hold the pipe tightly at bends, and then use the left hand bend the pipe slowly.

Hide quick links:

Advertisement

loading

This manual is also suitable for:

As-09hr4syddeb3As-12hr4svddeb1