Power Cable; Transceiver Unit Fs-5075T, Inside View - Furuno FS-1575 Installation Manual

Ssb
Hide thumbs Also See for FS-1575:
Table of Contents

Advertisement

Cable from
Antenna Coupler
Note: The inside of the FS-2575T is almost identical to that of the FS-5075T. See the
illustration above for connections.
2.2.2

Power cable

Fabricate the cable DPYC-6
(Max 10 m, FS-1575),
DPYC-10 (Max 10 m, FS-
2575) or DPYC-16 (Max 10
m, FS-5075) as shown be-
low. Attach the crimp-on
lugs supplied on the 24
VDC terminal to the cable.
Connect the cable to the 24
VDC terminal. If an equiva-
lent cable is used it must not
allow the voltage to drop
more than 5%.
Connect shield wire to
Cable
ground bar.
Power
fixing
cable
post
Ground bar

Transceiver Unit FS-5075T, inside view

70 (FS-1575T)
150 (FS-2575T,
8 - 10
FS-5075T)
50
Sheath
Set this part in cable clamp.
20
30
Vinyl tape
2. WIRING
Locking wire
saddle
Cable tie
Cable from
Control Unit
Armor
20
2-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fs-5075Fs-2575

Table of Contents