Prepare For Installation - HPE Aruba 2930F Quick Setup Manual And Safety/Regulatory Information

8g poe plus switch
Table of Contents

Advertisement

Prepare for installation

1.
Unpack and check included parts:
Switch
Console cable (5188–3836)
Accessory kits (installation hardware)
Part number
5189–6934
5300–0140
AC power adapter (5066–5559)
Power cord (See
Documentation kit (5200–1998)
NOTE:
plan to mount the switch on a wall or under a table, you will need to provide four 5/8–inch
number 12 wood screws.
2.
Prepare for installation.
CAUTION:
(page 4)
3.
Power-on and verify that the self-test completes normally. An Aruba 2930F 8G switch does
not contain a power on/off switch. It is turned on by connecting the power cord to the AC
power adapter and to a properly-grounded AC power source, then connecting the AC adapter
to the switch.
6
Aruba 2930F 8G Switch Quick Setup Guide and Safety/Regulatory Information
"Power cords" (page
Screws for mounting the switch on a wall or under a table are not included. If you
To avoid personal injury or product damage, review the
before beginning the installation.
Count
Included items
2
Rack mount brackets (long)
nl
nl
4
Large screws; bracket-to-rack
nl
nl
8
Small screws; bracket-to-switch
2
Wall/under-table brackets
nl
nl
8
Small screws; bracket-to-switch
nl
nl
1
Cable tie
nl
nl
4
Rubber foot pads
15).
"Installation precautions"

Advertisement

Table of Contents
loading

Table of Contents