Commissioning report

GE315 boilers can be operated with an oil or a gas
burner. During commissioning, carefully complete the
commissioning report for either the oil or gas burner.
Sign all commissioning work as completed and enter
the relevant date.
Commissioning work
1.
Fill the heating system with water
2.
Vent the heating system via radiators and air vents
Leak test carried out? (only for boilers supplied in
3.
sections)
4.
Check the location of the hot gas baffle plates
5.
Commission the control device
6.
Start up the burner
7.
Check the flue gas temperature
Inform the system user and hand over all relevant
8.
technical documentation
9.
Confirm professional commissioning
company stamp/signature/date
USER NOTE
Enter the fuel to be used into the table
(see operating instructions "Preamble",
page 2).
Logano GE315 - We reserve the right to make any changes due to technical modifications
Page
(individual steps)
Page 33
Page 19
Page 36
Page 36
See burner documentation
Page 36
System start-up
Comments
(signature)
2
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents