Buderus Logano GE315 Installation And Maintenance Instructions Manual page 16

Cast iron sectional boiler for oil or gaspressure jet burners
Table of Contents

Advertisement

2
Installation
Slacken the compression tool after the front section
has been assembled – but do not remove it yet!
Insert the tie bars before removing the compression
tool!
Insert the three tie bars with the spring sets mounted
into the locations provided in the cast profiles
(
Fig. 17, [1], [2] & 3).
Note when inserting the tie bars that the spring sets
are fitted at the back of the boiler.
By hand screw one nut onto each of the tie bars
threads.
ATTENTION!
Use the spring sets only as complete sets,
i.e. do not undo!
Now tighten the nuts on each tie bar by 1 to 1 ½ turns.
Align the boiler on the plinth or vibration absorbing
plinth in the horizontal and vertical plane (
2.3 "Positioning", page 9).
Remove the boiler compression tool.
The next step refers to the installation of the return
header (
Chapter 2.4.4 "Slide the return header
into place (carton of installation components)",
page 18).
16
Chapter
Logano GE315 - We reserve the right to make any changes due to technical modifications
2
1
Fig. 17 Installation of the tie bars
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents