Secure the rear upper boiler wall (Fig. 39, [2]) on the
back of the rear hood (Fig. 39, [1]) and on the side
walls.
Secure the lower rear boiler wall (Fig. 40, [2]) – with
the cut-out for the fill/drain cock at the bottom – on the
side walls (Fig. 40, [1] & [3]).
Hook the front wall (Fig. 41, [3]) at the bottom centre
into the plinth front (Fig. 41, [2]).
Hook the front wall at the top into the edge of the front
hood (Fig. 41, [1]).
Logano GE315 - We reserve the right to make any changes due to technical modifications
Fig. 39 Installation of the upper boiler back wall
3
Fig. 40 Installation of the lower boiler back wall
3
Fig. 41 Front wall installation
Installation
2
1
2
1
2
1
2
29