Control Unit - Buderus Logano GE315 Installation And Maintenance Instructions Manual

Cast iron sectional boiler for oil or gaspressure jet burners
Table of Contents

Advertisement

2
Installation
Hook the burner door cover into the front wall
recesses (Fig. 42, [1]).
Place the data plate (Fig. 42, [2]) according to boiler
location on the r.h. or l.h. side wall.
NOTE!
For boilers delivered as pre-assembled
blocks you will find the data plate together
with the installation and maintenance
instructions inside the combustion
chamber; if you receive loose components
you will find it inside a clear bag on the
burner door.
2.8

Control unit

2.8.1 Controller installation
Fig. 43 shows the control unit and the front cover as
viewed from the rear.
Loosen both screws (Fig. 43, [1]) securing the
terminal cover. Remove the terminal cover by pulling
it upwards.
Mount the control unit. Insert the control unit at the
front of the boiler with the locating tabs (Fig. 43, [4])
into the oval apertures of the front boiler hood
(Fig. 43, [5]). Pull the control unit forward and then
pivot it back. Ensure that the resilient hooks (Fig. 43,
[2]) engage at the rear into the rectangular apertures
of the front boiler hood (Fig. 43, [3]).
Secure the control unit base on the r.h. and l.h. side
of the cable way (Fig. 43, 6) in the front boiler hood
with two self-tapping screws (Fig. 43, [7]).
30
Logano GE315 - We reserve the right to make any changes due to technical modifications
1
Fig. 42 Hooking on the burner door cover
1
7
6
Fig. 43 Control unit installation
2
5
4
3
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents