Ibc Boiler Controller; General; Control - IBC SL 40-399 G3 Installation And Operating Instructions Manual

Modulating gas boilers natural gas or propane
Hide thumbs Also See for SL 40-399 G3:
Table of Contents

Advertisement

NOTE
No sharp or metallic object
should be used on the
touchscreen as this will cause
damage. Use only a Stylus or a
clean finger."
BOILER SYSTEMS AND OPERATION
SL 26-260 G3, SL 40-399 G3 MODULATING GAS BOILERS

2.0 IBC BOILER CONTROLLER

2.1 GENERAL

This boiler is equipped with the V-10 Touchscreen controller. The controller simplifies the
programming of the boiler while providing greater flexibility. For more detailed instructions,
reference the Touchscreen Boiler Controller manual.
The controller is equipped to provide:
Control of up to 5 pumps – 1 boiler pump + 4 separate load pumps
Outdoor Reset control
Set Point temperature regulation
Domestic Hot Water (DHW)
External control via 0-10VDC or 4-20mA signaling
Alarm dry contacts
Load Combining – simultaneous operation of 2 similar water temperature loads
The control can manage and/or operate in a network of up to 24 IBC VFC or SL boilers
Some of the new features available in the touchscreen control include:
Express Setup Menu for simple, quick programming
Software updatable in the field with an SD card or a USB stick
Setup configuration back-up and cloning using an SD card or USB stick
Superior warning messages while setting up the control
Advanced Error messages with visual display on the Home Screen
Internet/LAN connectivity
BACnet (with activation)

2.2 CONTROL

When the boiler is first energized, the controller will go through a power up sequence that
will take approximately 90 seconds. During this time the controller is completing a self-
diagnostic and loading all previous settings. In the event of a power interruption the boiler
will automatically resume operation when power is restored with all the previously stored
values. The controller provides overall management of the boiler operations including:
Power-up, Self-diagnostics, easy Load parameter adjustments
Burner operation, safety management systems, Call for Heat management and Load
Priority
Real time boiler data
Temperature and throttle operation
Maintenance of operational and error service logs
2-way communication between other IBC boilers and controls
Operational and historical data may be accessed at any time using the System Status
and Load Profiles sections of the control. Error logs are available in the Diagnostics
section and the controller is capable of recording any or all errors since original power-up
complete with the date and time of the error.
2-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl 26-260 g3

Table of Contents