Section 10
Testing functionality by secondary injection
10.9.2.2
10.9.3
10.9.3.1
94
5.
Activate BLOCK binary input, the signals LVL_ALM, LVL_LO should
disappear.
6.
Reset the BLOCK binary input.
7.
Check for reset lock out input RESET_LO to reset the LVL_LO lock out signal.
8.
Conduct these steps for temperature input as well to detect and reset TEMP_ALM
and TEMP_LO signals.
9.
Continue to test another function or end the test by changing the TESTMODE
setting to Off.

Completing the test

Continue to test another function or end the test by changing the TestMode setting to
Off. Restore connections and settings to their original values, if they were changed for
testing purposes.

Breaker monitoring SSCBR

Prepare the IED for verification of settings outlined in section "Testing the IED
operation".
The Signal Monitoring tool in PCM600 shows the service values that are available on
the Local HMI as well.
Values of the logical signals belong to the breaker monitoring are available on the
local HMI under: Main menu/Test/Function status/Monitoring/
BreakerMonitoring/SSCBR:x

Verifying the settings

1.
Connect the test set for the injection of a three-phase current to the appropriate
current terminals of the IED.
2.
If current need to be injected for a particular test, it should be done in the phase
selected by the PhSel parameter.
3.
Follow the sequence for positioning the auxiliary contacts before testing:
POSCLOSE
POSOPEN
4.
Test of CB contact travel time
4.1. Test the set timing defined by OpenTimeCorr, CloseTimeCorr,
tTrOpenAlm and tTrCloseAlm.
4.2. Change the status of the auxiliary contacts such that travel time to open
TTRVOP and travel time to close TTRVCL exceed the respective set values
(tTrOpenAlm and tTrCloseAlm). The measured travel time for opening and
closing is shown on TTRVOP and TTRVCL respectively.
4.3. Check that TRVTOPAL and TRVTCLAL are activated.
5.
Test of CB status
1MRK 504 160-UEN -
0
1
0
0
Transformer protection RET650 2.1 IEC
Commissioning manual
0
1

Advertisement