Forcing By Using Pcm600 - ABB RET650 2.1 IEC Commissioning Manual

Transformer protection
Table of Contents

Advertisement

Section 9
Testing IED operation
9.8.3.2
62
"frozen" at the value selected by the user, even if the IED is switched
off and back on again.
Freezing a signal value without changing it
Set the status of a signal to Forced, in the forcing menu that corresponds to the I/
O card in question. See example of LHMI menu in figure
IEC15000020 V1 EN
Figure 12:
Example of LHMI menu using BIM3
The signal "freezes" and will not change value even if, for example, a binary input
signal voltage changes level, or if a binary output is activated as the result of a
protection function block activating.

Forcing by using PCM600

In PCM600 the concept is a bit different compared to LHMI. The forcing is
accomplished by entering a forcing session. Within such a session, multiple signals on
multiple I/O boards may be edited and changed at the same time and has no effect on
the IED. Once the user is satisfied with the forcing setup, then all the changes can be
effectuated simultaneously towards the IED, potentially changing inputs and outputs
on multiple I/O boards at the same time. It is also possible to abort this operation
(described in step 6 below) and to
1.
Right click on the IED in the plant structure and select Signal Monitoring.
2.
Click on the List View tab.
3.
Click Forcing Session in the menu IED/Start Forcing.
undo all
forcing.
Transformer protection RET650 2.1 IEC
1MRK 504 160-UEN -
12
Commissioning manual

Advertisement

Table of Contents
loading

Table of Contents