Post-Installation Checklist - 3Com 3C16895 Installation Manual

3c16895 7-slot chassis 3c16894 4-slot chassis and associated modules
Hide thumbs Also See for 3C16895:
Table of Contents

Advertisement

Post-installation
Checklist
Follow the parameters defined in Table 42 for binding cables with ties.
Table 42 Cable Binding Parameters
Cable Bundle Diameter
10 mm (0.5in)
10-30 mm (.5 – 1.2 in)
30 mm (1.2 in)
After you install your switch, use the checklist in Table 43 to verify that your switch
operates correctly.
WARNING: Confirm that you have turned off the power before checking your
installation. Improper connections can injure people or damage components of
the switch.
Table 43 Installation Checklist
Item
Antistatic wrist strap
Console cable
Ground wire
Power cord
Fabric
I/O module
Fan frame
Space Between Bundles
80-150 mm (3.5 – 6 in)
150-200 mm (6 – 8 in)
200-300 mm (8 – 12 in)
Normal

Post-installation Checklist

Abnormal (Remarks)
43

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 3C16895 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

77503c16894

Table of Contents