Samsung MIM-E03*N Installation Manual page 24

Control kit
Hide thumbs Also See for MIM-E03*N:
Table of Contents

Advertisement

Specification table
Tab-Terminal (output)
Connection load
Output(CNP003,CNP001 or
(CNP003,CNP001)+(CNP003,CNP002)
Backup boiler
Connection of the back-up boiler
Description
Back-up Boiler
B5
Back up boiler (N)
B4
Back up boiler (L)
When it set back up
boiler on the control kit
(relay off )
L N
Boiler
EHS MONO Kit-EU_IM_05388A-00_EN.indd 23
Part
No. of wires
Max. A
2+ground
10 mA
1 . Before the installation, control kit should be turned off .
2 . Using the appropriate equipment to correct position of terminal
block as shown on the diagram .
3 . Make sure EXT-CTRL signal of back up boiler must be 230Vac .
- Do not connect supply power of back up boiler directly .
When it order to back up
❋ ❋ Heat pump does not work when the Back-up boiler operates .
boiler operates (relay on)
L N
Boiler
Specification
Step1 : CNP003, CNP001
Step2 : CNP003, CNP002
Relay or Magnetic contactor for a control signal
AC 230V (MAX 0 . 5 A)
Thickness
2
0 . 7 5mm
H05RN-F or
Field supply (230 V~,
H07RN-F
Supply Scope
Input)
23
2015-03-18 오전 11:53:44

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents