Samsung AG042KSVANH Service Manual page 21

System air conditioner dvm chiller
Hide thumbs Also See for AG042KSVANH:
Table of Contents

Advertisement

13) Separates the fixed screw of pump terminal. (using - screw driver or exclusive tool)
14) Connect power wire to terminal as a existing assembly condition.
Connection mothod of pump have Y-connection & Delta connection method.
This model must be connected by Y-connection method because it uses 3-Phase
high boltage power.
15) When you replace the Pump, replace it to purchase together with
the Cable Holder(DB61-0091E).
The gap between steel plate and nut must be 1.3~1.5mm when you assemble
the cable holder.
16) Please reassemble in reverse order of disassembly.
Bolt torque at time of coupling tightening : 200±10% kgfcm.
After reassembly, please reassemble so that diagonal line part of coupling side is
not intersected each other.
PROPERLY
PROPERLY
ASSEMBLED JOINT
ASSEMBLED JOINT
POSITIVE OFFSET
NEUTRAL OFFSET
WITH BOLT PAD
WITH BOLT PAD
CONTACT
CONTACT
17) When you insert ASSY Pump, set to the groove of Base & Bracket and then
reassemble adjusting Bolt Hole.
IMPROPERLY
IMPROPERLY
ASSEMBLED JOINT
ASSEMBLED JOINT
NEGATIVE
BOLT PAD
OFFSET
GAP
17
Gap :
1.4 ± 0.1mm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents