Transport; Storage - ION F-18 User Manual

Online double-conversion ups 1kva/2kva/3kva
Table of Contents

Advertisement

1.3.5 Testing New Batteries
For a battery test, please check:
The batteries must be fully charged.
The UPS must be in Normal mode with no active alarms.
Don't take on/off the load.
To test batteries:
1. Connect the UPS to utility power for at least 48 hours to charge the
batteries.
2. Select "Start battery test" by pressing
the battery test on line mode or HE mode.
1.3.6 Recycling the Used Battery:
Warning:
Never dispose the batteries in a fire. It may explode.
Do not open or mutilate the batteries. Released electrolyte is harmful to
the skins and eyes. It may be toxic. A battery can present a risk of
electrical shock and high short circuit current.
To recycle properly the used battery, please do not discard the UPS, battery
pack and batteries into the trash bin. Please follow your local laws and
regulations; you may contact your local recycling waste management center
for further information to dispose properly of the used UPS, battery pack, and
batteries.

1.4 Transport

Please transport the UPS only in the original packaging (to protect against
shock and impact).

1.5 Storage

The UPS must be stockpiled in the room where it is ventilated and dry.
on the menu of "Control" to start
14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents