Flying Ks28; Assembly - L-Acoustics KS28 Rigging Manual

Hide thumbs Also See for KS28:
Table of Contents

Advertisement

Rigging procedures

Flying KS28

type of deployment
rigging accessories
additional material
min number of operators
Secondary safety on KS28-BUMP
Use the holes next to the pick-up points to implement a secondary safety. Refer to
Consider using LA-SLING2T.
Risk of falling objects
Verify that no unattached items remain on the array.

Assembly

Procedure
1. Secure two chains to the selected pick-up points on KS28-BUMP.
2. Lift the assembly.
3. Position a stack of KS28 under the pickup point.
See
Stacking KS28 vertically
KS28 rigging manual (EN) version 2.0
(p.17).
own array
KS28-BUMP
LA-SLING2T (optional)
KS28-CHARIOT (optional)
2 Ø19 mm shackles WLL 3.25 t
2
KS28-BUMP
(p.12).
20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents