Gravely ZT Xl Bagger Owners Operating Manual And Parts List page 10

Table of Contents

Advertisement

Install Counterweights
WARNING: ALWAYS install counterweights
before operating unit with bagger attached.
ALWAYS remove counterweights when bagger
is removed from unit.
1. Remove mounting hardware from footrest
(figure 4).
NOTE: The hex bolt and washers will be reused when
installing the bagger.
Remove Footrest
Remove Mounting Hardware
2. Install bagger weight bracket (item 7) on unit with
two 3/8" x 1" hex bolts (item 31), washers
25/64" x 1-1/2 x 1/8" washers (item 34) and 3/8"
nylon locknuts (item 37) (figure 5).
3. Install the axle mount bracket (item 8) on the front
axle with three 3/8" x 2" hex bolts (item 40) and
three 3/8" nylon locknuts (item 37). Connect the
bagger weight bracket and the axle mount bracket
with a 5/16" x 3/4" roundhead squareneck bolt
(item 41) and 5/16" nylon locknut (item 39).
4. Install two counterweights (item 9) on bagger
weight bracket (item 7) and axle mount bracket
(item 8) with two 1/2" x 5" hex bolts (item 12), two
33/64" x 1-7/16 x 1/8" flat steel washers (item 17)
and 1/2" top locknuts (item 38).
5. Install the footrest removed in step 1.
Figure 4
41
31
8
39
38
17
GB – 10
40
34
37
37
12
9
38
Figure 5
31
34
37
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zoom xl bagger

Table of Contents