Spectrum Z510 Preventative Maintenance Procedure
Description:
This procedure is for the purpose of preventative maintenance on the Spectrum 510.
Prerequisites:
Printers should be inspected for bulletin updates before ordering parts for maintenance.
Bulletins can be found on the Z Corp Website.
Equipment / Parts Required:
50342 Dealer Recommended Toolkit.
50355 Spectrum Z510 Maintenance Kit.
10674 Syringe, Luer-Lock, 20cc (Accessories Kit)
06775 PL Needle Tubing Assy (Accessories Kit)
09947 Fluid clean out procedure
Clamp or hemostats (15237 or equivalent)
Paper towels
Can of compressed air (to clean powder from fan
Procedure
Perform the items on the checklist below.
Give Customer a copy of the completed checklist for reference.
Spectrum Z510 Preventative Maintenance Kit #50355
06419
Toucan Septum Assy
30011
Service Station Wiper
30052
Toucan Roller Scraper
30550
Toucan Gantry Anti-Rotate Bearing
15055
Inline Filter
85063 Spectrum Z510 Preventative Maintenance Procedure
80563
Rev D
4
each
1
each
1
each
1
each
4
each
1/12

Advertisement

loading

Summary of Contents for Z Corporation Spectrum Z510

  • Page 1 Can of compressed air (to clean powder from fan Procedure • Perform the items on the checklist below. • Give Customer a copy of the completed checklist for reference. Spectrum Z510 Preventative Maintenance Kit #50355 06419 Toucan Septum Assy each 30011 Service Station Wiper...
  • Page 2 Visual inspection Check flow rate at septum Check for air bubbles Visual inspection Check purge time Check temperatures while purging Change binder tank in-line filters Pull hoses off with pliers and insert new filters 85063 Spectrum Z510 Preventative Maintenance Procedure 2/12...
  • Page 3 External keyboard and monitor (manufacturing Window) 7.While Printing Document #s/Notes Run alignment Check for streaks Check for short spread/over spread Check for smooth spread Check rails for noise Additional Comments: Technicians signature:______________________________________________ Customer Signature:________________________________________________ 85063 Spectrum Z510 Preventative Maintenance Procedure 3/12...
  • Page 4 Pull all the binder tubes loose from the septa. Note- make sure you have your paper towels handy. When the tubes are pulled from the septa, binder will leak from the tubes. 85063 Spectrum Z510 Preventative Maintenance Procedure 4/12...
  • Page 5 Old septum shown with the four plastic washers that must be re-installed on new septa before installation. Septum being removed. Note – The plastic washer tends to stick to the carriage. Do not lose them. 85063 Spectrum Z510 Preventative Maintenance Procedure 5/12...
  • Page 6 Some carriages may have the yellow tube going under the clear. If so, please re-route at this time. Re-attach the binder tubes 85063 Spectrum Z510 Preventative Maintenance Procedure 6/12...
  • Page 7 Re-install the Fast axis module and pull several syringes of binder through the septa to clear all air bubbles. Re-install the print heads (purge if new heads) Run an auto- alignment. 85063 Spectrum Z510 Preventative Maintenance Procedure 7/12...
  • Page 8 Remove the two hex screws that mount the assembly into place. Note – The ZPrinter 510 and ZPrinter 650 use the same wiper assembly, and the mounting screws and method is the same. 85063 Spectrum Z510 Preventative Maintenance Procedure 8/12...
  • Page 9 Clean the holes from both sides. Align the rubber wiper with the holes in the squirter block and wrap around the block. 85063 Spectrum Z510 Preventative Maintenance Procedure 9/12...
  • Page 10 1/8 inch. This should be a visual indication that the pressure is even on the two screws and the assembly is tightened enough. Return power cord to system, power up the system. 85063 Spectrum Z510 Preventative Maintenance Procedure 10/12...
  • Page 11 (reading ml) to the chart. 9. Should get 8-10 ml/30 sec. (depends on how much binder is in the tanks) If you get within this range you do not have a flow problem! 85063 Spectrum Z510 Preventative Maintenance Procedure 11/12...
  • Page 12: Change History

    Information contained in this document is the confidential property of Z Corporation. Recipient shall not disclose such Information to any third party, and shall not use it for any purpose whatsoever other than to price or provide services to Z Corporation. © Z Corporation 1995-2011. All rights reserved.