Leveling; Electrical Connections - Fagor QR-1 Installation, Use And Maintenance Manual

Table of Contents

Advertisement

REACH-INS OPERATIONAL SERVICE MANUAL / Rev.JUN. 2015
3.5

LEVELING

Set unit in its final location. A level cabinet looks better and will perform better. Effective condensate
removal and door operation will be effected by leveling. Machine must be leveled front to back and
side to side with a level tool. Castors k i t w i l l include shims for leveling. Insert the shim between the
castor and the frame rail. (See installation of castors). Lock front castors so cabinet does not move.
Ensure drain hose is inside drain pan.
3.6

ELECTRICAL CONNECTIONS

Refer to the amperage data in this manual, or on data plate, and your local code or the National
Electrical Code to be sure unit is connected to the proper power source. Verify correct incoming
voltage according to the Data Plate information.
Do not, under any circumstances, cut or remove the ground prong from the power cord. Fagor units
must be properly grounded.
NEVER USE AN EXTENSION CORD! Fagor will not warranty any unit that has been
connected to an extension cord.
Fagor equipment must be grounded and connected in accordance with NEC Article 422Appliances.
DANGER:
Power must be turned off and disconnected from the power source whenever performing
maintenance, repair or cleaning the condensing unit.
If machine is still running when power is off, disconnect power at the circuit breaker before
unplugging the machine.
WARNING:
Machine and compressor warranties are void if failure is due to improper electrical
www.Fagorcommercial.com
PAGE 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents