Cold Laminate Processing Installation And Processing Of Cold Laminate Film - LAMI Freesia 55C Instruction Manual

Table of Contents

Advertisement

Cold Laminate Processing
Installation and Processing of Cold Laminate Film
【1】 Install the paper tube holder on the film shaft.
All 6 film shafts are common parts.
Use hex wrench to move or fixate the branch pipe holder.
【2】 Install the under-film.
Refer to the figure below to pass the under-film while laminate roller (top) is lifted.
Under-film
【3】 Install the laminate film.
Pass the laminate roller through the under roller with the release paper attached and then put down the laminate
roller.
Under-film
12
① Idle roller (front)⇒② front signboard⇒③ laminate roll⇒④ back signboard
Fixate 4 sides of each
branch pipe holder.
Laminate film

Advertisement

Table of Contents
loading

Table of Contents