Disassembly Procedure - Mitsubishi Electric PUZ-A12NKA7 Service Manual

Split-type, heat pump air conditioners split-type, air conditioners
Hide thumbs Also See for PUZ-A12NKA7:
Table of Contents

Advertisement

14

DISASSEMBLY PROCEDURE

PUZ-A12NKA7
PUZ-A12NKA7-BS
OPERATING PROCEDURE
1. Removing the top panel, service panel, front panel,
back panel, and grille
(1) R emove the top panel fixing screws (4 × 10), one from
the right and two from the left side, and detach the top
panel.
(2) R emove 2 service panel fixing screws (4 × 10) and
detach the service panel by pulling it downward. (See
Photo 2)
(3) R emove the front panel fixing screws (4 × 10), 3 from
the front, 2 from the right and 2 from the left side, and
detach the front panel.
(4) R emove the back panel fixing screws (4 × 10), 5 from
the right and 2 from the rear side, and detach the back
panel.
(5) Remove 2 grille fixing screws (4 × 10) and detach the
grille.
2. Removing the fan motor
(1) Remove the top panel. (See Photo 1)
(2) Remove the front panel. (See Photo 1)
(3) Remove 1 nut (M6, left-screw) and detach the propeller.
(4) D isconnect the connector CNF1 on the controller circuit
board in the electrical parts box.
(5) Loosen the clamp for the lead wire in the motor sup-
port.
(6) R emove 4 fan motor fixing screws (5 × 20) and detach
the fan motor. (See Photo 4)
OCH636A
PUZ-A18NKA7
PUZ-A18NKA7-BS
PUY-A12NKA7
PUY-A12NKA7-BS
PHOTOS
Top panel fixing screws
Photo 1
Grille
Grille
fixing screws
Front panel
fixing screws
Front panel
Photo 2
2 hooks
Photo 3
Nut
Fan motor fixing screws
Photo 4
Fan motor
(MF1)
Fan motor fixing screws
104
PUY-A18NKA7
PUY-A18NKA7-BS
PHOTO: PUZ-A12NKA7
Top panel
Top panel
fixing screw
Back panel
Service panel
Service panel
fixing screw
Pull down
Electrical parts box
Propeller
Clamp
Motor support

Advertisement

Table of Contents
loading

Table of Contents