IBM Z10 Installation Manual page 29

Business class
Hide thumbs Also See for Z10:
Table of Contents

Advertisement

Level 03c, May 2011
I M P O R T A N T
The z10 BC is comprised of some of the most sophisticated and complex
electronic equipment ever integrated into one computer. As such, this
hardware needs to be protected from negative environmental impacts to
ensure the utmost reliability. One of the key factors affecting this reliability is
moving the system from the loading dock into the controlled environment of
your computer room on the day it is delivered.
To ensure that optimum environmental conditions are maintained, work with
your marketing representative to schedule the delivery at a time when you can
transport the system components from the point of delivery to the computer
room destination without unnecessary delay. Prompt handling upon arrival will
prevent any possibility of a problem caused by exposure to temperature
extremes, severe weather, or high humidity.
17
Chapter 3. Models and physical specifications

Advertisement

Table of Contents
loading

Table of Contents