Test Run Procedure - Panasonic S-200PE2E5 Technical Data & Service Manual

Dc inverter
Table of Contents

Advertisement

2-9. Test Run Procedure

2
Turn ON the indoor and
outdoor power
(Automatic Address setting)
Recheck the items to check before the test run.
Check the combination (wiring) of indoor and outdoor units.
YES
Is system "single-type"?
(1 indoor unit is connected
to 1 outdoor unit)
NO
Are multiple outdoor
units used?
NO
Turn ON the indoor and outdoor power.
(Automatic Address Setting)
Set the indoor unit control switch to "TEST".
Can operation
be started?
YES
Slide the indoor unit control switch back to "ON".
(See 2-10)
(See 2-15)
Confirm wiring is done in
accordance with Fig. 2, "Basic Wiring".
How to Set Automatic Address
Set the automatic address setting
(See 2-12)
Refer to "Table of Self-Diagnostic Functions"
NO
to check the system.
In addition, refer to 2-15 and correct any
items that need to be corrected.
Note: Check the indoor-
(See 2-12)
2-8
YES
(See 2-15-2)
In case of group control
(See 2-15-3 to 2-15-6)
from outside unit.
(See 2-14)
side drainage.
Fig. 2-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents