Chappee initia MASTER 2.24 FF Installers And Users Instructions page 8

High efficiency wall-mounted gas-fired boilers
Table of Contents

Advertisement

Available languages

Available languages

Horizontal flue terminal installation options
Fr
CN
GB
Gr
SP
PT
LAS flue duct installation options
L max = 5 m
Vertical flue terminal installation options
This type of installation can be carried out both on a flat or pitched roof by fitting a
terminal, an appropriate weathering tile and sleeve, (supplementary fittings supplied
on demand).
L max = 4 m
For detailed instructions concerning the installation of fittings refer to the technical data
accompanying the fittings.
L max = 5 m
L max = 4 m
L max = 4 m
L max = 5 m
L max = 4 m
L max = 2 m
46
L max = 3 m

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Initia master 2.24 cf

Table of Contents