Dear Customer, We are sure your new boiler will comply with all your requirements. Purchasing one of our products satisfies your expectations: good func- tioning, simplicity and ease of use. Do not dispose of this booklet without reading it: you can find here some very useful information, which will help you to run your boiler correctly and efficiently.
Page 5
3.1 Description of keys (2) This key can be pressed to set the central heating water output temperature as described in point 3-3. (3) This key can be pressed to set the domestic hot water temperature as described in point 3- (10) Central heating mode operating key key can be pressed to activate four boiler central heating operating modes;...
4. Filling the boiler Important: Regularly check that the pressure displayed by the pressure gauge is 1 to 1.5 bar, with boiler not operating. In case the pressure is lower open the boiler filling tap. We recommend you open the tap very slowly in order to let off the air. In case pressure drops occur frequently have the boiler checked by a Qualified Service Engineer.
To avoid damaging metal, plastic and rubber parts, use only neutral cleaners, i.e. non-acid and non- alkaline such us SENTINEL X100 and FERNOX heating circuit protective. To use this product proceeding strictly in accordance with the maker’s directions. Remember that the presence of foreign matter in the heating system can adversely affect the operation of the boiler (e.g.
Page 14
Flue duct terminal Max. length Each 90° bend Each 45° bend Flue Outer of flue duct reduces the duct reduces the duct terminal terminal max. length by max. length by diameter diameter Coaxial Ø 80/125 mm 10 m 0,5 m 133 mm 125 mm Vertical two-pipe...
Page 15
Vertical flue terminal Ø 80/125 mm installation options This type of installation can be carried out both on a flat or pitched roof by fitting a terminal, an appropriate weathering tile and sleeve, (supplementary fittings supplied on demand). L max = 10 m L max = 10 m L max = 8 m L max = 9 m...
Page 16
Twin horizontal flue terminals installation options IMPORTANT: Ensure a minimum downward slope of 1 cm toward the outside per each metre of duct length Make sure that the exhaust and intake ducts are securely fixed to the walls. L max = 15 m (L1 + L2) max = 60 m The maximum length of the suction duct must be 15 metres.
Page 19
Cover Terminal board Terminal board Cover Terminal board P1 = Low loss header pump P2 = Heating circuit pump SI = Low loss header (available optional extra) UR = Central heating unit Safety valve (*) Expansion vessel (*) available optional extra Figure 10...
Page 20
- Exchangers pressure drop WATER FLOW RATE (l/h) Graph 1 The minimum ga boiler water flow, with at least 1 - 1,5 bar, must be as follow: 1.45 FF HTE 1000 1.55 FF HTE 1000 1.65 FF HTE 1200 13.2 Description of the electri-...
Page 24
13.6 Connecting the The domestic hot water pump (P3), which directs flow into an eternal storage tank, is connected to pump – hot water circuit terminals 13-14 of boiler terminal strip M3 (figure 12). The electrical specifications of the pump must be as follows: 230 V AC;...
14. Gas valve adjustment Carry out the following operations in the given sequence: 1) Calibration of the maximum heat output. Check that the CO measured on the flue, with the boiler operating at the maximum heat output, is the same as that shown in table 1. Otherwise, turn the regulation screw (V) on the gas valve.
15. Setting the boiler The boiler parameters may only be modified by professionally qualified staff proceeding as fol- parameters lows: a) press the , keys on the boiler’s front panel together for about 3 s until the parameter H90 appears on the display; b) press the keys to select the parameter for modification;...
16. Control and operation The boiler has been designed in full compliance with European reference standards and in particular devices is equipped with the following • Overheat thermostat Thanks to a sensor placed on the heating flow, this thermostat interrupts the gas flow to the main burner in case the water contained in the circuit has overheated.
18. Check of combustion To measure combustion performance and hygiene levels of combustion products, the forced draught parameters boiler models are equipped with two test points on the tapered coupling specifically designed for this purpose. One of the two test points is connected to the exhaust flue duct to allow measurements of the com- bustion products hygienic standards and combustion efficiency.
Need help?
Do you have a question about the 1.45 FF HTE and is the answer not in the manual?
Questions and answers