Connecting the mains supply
Electrical safety of the appliance is only guaranteed by correct grounding, in compliance
with the applicable laws and regulations.
Connect the boiler to a 220-230V monophase + ground power supply by means of the
three-pin cable supplied with it and make sure you connect polarities correctly.
Use a double-pole switch with a contact separation of at least 3mm in both po-
les.
In case you replace the power supply cable fit a HAR H05 VV-F' 3x0.75mm
an 8mm diameter max.
...access to the power supply terminal block
•
isolate the electrical supply to the boiler by the double-pole switch;
•
unscrew the two screws securing the control board to the boiler;
•
rotate the control board;
•
unscrew the lid and gain access to the wiring (Figure 10).
A 2A fast-blowing fuse is incorporated in the power supply terminal block (to check or
replace the fuse, pull out the black fuse carrier).
(L)
= Live brown
(N)
= Neutral blue
(
)
= Ground yellow/green
(1) (2) = room thermostat terminal
Fitting a room thermostat
•
gain access to the power supply terminal block (Figure 11) as described in the previous
section;
•
remove the jumper placed on terminals (1) and (2);
•
insert the duplex cable through the core hitch and connect it to the two terminals.
Connecting a programming clock
*
connect the programming clock motor to the main PCB CN1 connector (terminals
1 and 2);
*
connect the programming clock switch to the CN1 connector terminals (3 and 4) and
remove the jumper.
In case you are fitting a battery-operated programming clock do not connect the CN1
connector terminals (1 and 2).
indice
Figure 9
CONTrOL POSITION
(L1+L2) MAx
0÷4
4÷18
18÷30
cable with
2
49
opening
G.20
1
2
6,7
3
terminal board
Figure 10
Figure 11
CO2%
G.30
G.31
7,3
7,3
Fr
CN
GB
Gr
SP
PT