Install the storage controller and close the PCIe slot cover retainer.
10.
If you installed a cache module on the storage controller, connect the cache module cable to the
11.
system board connector. For cache module cabling information, see "FBWC module cabling (on
page 90)."
Connect all necessary cables to the storage controller and drive cage backplane. For internal drive
12.
cabling information, see "Storage cabling (on page 83)."
If not installed, install the fan included in the PCI fan and baffle option
13.
page 57).
Install the system air baffle (on page 22).
14.
If removed, install the PCI air baffle
15.
Install the access panel (on page 18).
16.
Return the server to an upright position.
17.
Connect each power cord to the server.
18.
Connect each power cord to the power source.
19.
Power up the server.
20.

Installing a Smart Storage Battery

To install the component:
Power down the server (on page 17).
1.
Remove all power:
2.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Place the server on its side.
3.
Remove the access panel (on page 17).
4.
If installed, remove the PCI air baffle (on page 20).
5.
Remove the system air baffle (on page 21).
6.
Install Smart Storage Battery holder if not installed
7.
52).
("Install the PCI air
baffle" on page 20).
("Smart Storage Battery holder
("PCI fan and baffle
option" on
option" on page
Hardware options installation 48

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents