Install the 4-bay LFF hot-plug drive cage assembly in box 2.
14.
Connect the drive cage cables. See "4-bay LFF hot-plug drive cabling (on page 84)." Then, install
15.
the drives.
Install the system air baffle (on page 22).
16.
If removed, install the PCI air baffle
17.
Install the front bezel (on page 19).
18.
Install the access panel (on page 18).
19.
Return the server to an upright position.
20.
Connect each power cord to the server.
21.
Connect each power cord to the power source.
22.
Power up the server.
23.

8-bay SFF hot-plug drive cage option

To install the component:
Power down the server (on page 17).
1.
Remove all power:
2.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Place the server on its side.
3.
Remove the access panel (on page 17).
4.
Remove the front bezel (on page 19).
5.
If installed, remove the PCI air baffle (on page 20).
6.
Remove the system air baffle (on page 21).
7.
Disconnect all existing drive cage cables.
8.
("Install the PCI air
baffle" on page 20).