LonWorks Gateway setting (Continued)
Monthly baseline setting
1
Click [Setting and Checking Watt-hour meter].
2
Click [Edit] from the 'Monthly baseline setting' screen.
You can make changes when list box enables.
3
Set the Monthly baseline setting.
You can select from 1~31.
If you select the last day of the month, it will automatically set the last day
of corresponding month as baseline.
Ex) Last day of February: 28
Power consumption is calculated for a month before monthly baseline.
Ex) Monthly baseline: 28
Today: 19
Time period for power consumption and operation: 29
4
Click [Save].
Changed settings will be saved to the LonWorks Gateway.
If you do not click [Save] changed setting will not be saved.
Period setting
1
Click [Setting and Checking Watt-hour meter].
2
Click [Edit] from the 'Period setting' screen.
You can select checkbox to set period in daily or monthly unit.
If you select daily period setting, text box will be enabled and you can enter
the period in daily unit.
If you select monthly period setting, you can select the period in monthly
unit.
3
Set the period
If you set period in daily unit, you can set up to maximum 90 days.
If you set period in monthly unit, you can set up to maximum 1 month.
4
Click [Save].
Changed setting will be saved to LonWorks Gateway.
If you do not click [Save], changed setting will not be saved.