Battery Installation (Optional) - Hitron CGNVM User Manual

Docsis 3.0 emta wifi gateway
Table of Contents

Advertisement

1.3

Battery Installation (optional)

Depends on your multiple system operator (MSO), the CGNVM may be equipped
with a lithium-ion battery backup that can provide emergency power to the device in
the event of a power outage.
You can install and replace the CGNVM's battery without disconnecting the power
cable.
NOTE:
The CGNVM battery is intended for use as a backup to the main power
source, not as a replacement for it. For optimal power performance you
should use the battery in conjunction with the main power source.
For safety and regulatory reasons, batteries are shipped separately to the CGNVM,
and must be manually installed. To install the battery:
1
The battery compartment is located on the underside of the CGNVM. Place the
CGNVM on a table and remove the battery compartment door.
Figure 4:
Battery Compartment (optional)
2
Remove the battery from its packaging.
19
19
Version 1.0, 02/2015. Copyright
Version 1.0, 02/2015. Copyright
Hitron CGNVM User's Guide
2012 Hitron Technologies
2014 Hitron Technologies
INTRODUCTION

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents