Effecta Pellets 222 Owner's Manual page 14

Table of Contents

Advertisement

The motherboard
Remember to always cut the power to the boiler before starting any work
on it. All electrical work should be done by a certified electrician, for everyo-
nes safety.
G1
Temp sensor boiler NTC 22 kΩ
G2
Sensor flue gas PT1000
G3
Extern control
G4
G5
Sensor accumulator tank low NTC 22 kΩ
G6
Sensor accumulator tank high NTC 22 kΩ
G7
Sensor, radiator flow NTC 22 kΩ
G8
Flame sensor
1U.
Connection to display board
2U.
Connection electricity board
1.
Outdoor sensor
2.
Outdoor sensor
3.
Room sensor (6)
4.
Room sensor (1)
5.
Room sensor (4)
Change of e-prom
Cut the power to the boiler. Remove the front panel on the boiler so you can reach the backside
of the display. Gently remove the e-prom. Fit the new e-prom and gently push it into place.
Reassembly the front panel.
Before shifting a e-prom make sure to write down all the settings that has been done
to the boiler. This since all the changes that has been done will be lost.
1 4
Effecta AB - Västra Rågdalsvägen 21 - 434 99 Kungsbacka - +46(0)300 - 22320 - info@effecta.se
PE
Incoming Earth
N
Incoming zero
L1
Incoming phase 6,3 A/230 VAC
PE
Earth
N
Zero
11
Radiator pump 2A/230 VAC
12
Shunt motor
N
Zero
13
Shunt motor 2A/230 VAC
PE
Earth
N
Zero
14
Solenoid valve AERO 2A/230 VAC
PE
Earth
N
Zero
15
Compressor 2A/ 230 VAC
PE
Earth
N
Zero
16
Magnet motor tube cleaning 2A/230 VAC
N
Zero
17
Loading pump 2A/230 VAC
While mounting the e-prom make
sure that the "legs" isn´t damaged
Check so that the marking of the
prom is set at the correct side.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents