Verify dc voltage at battery cabinet switch
Verify that appropriate ac fuses are present
Verify that appropriate dc fuses are present
Verify that neutral is always connected
Verify that mains ac power CBs are disconnected,
the battery CB is disconnected, and all external
switches are Off
If you have installed a maintenance bypass switch,
verify that it is set to Normal (Off)
Comments on site preparation – electrical: __________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
Apply ac power and measure dc voltage
Turn the battery switches On to conduct
Verify module configuration and redundancy
Check the controller definition of total AH of the
batteries
Verify date, time, and serial number
Enter IP address of UPS into the controller
Comments on initial startup: __________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
Measure output voltage with all ac inputs Off
Measure output voltage after cold start
Measure ac input voltage under load
Check total system load
Check correct operation
Check IP communication with controller (option)
Test Wing (option)
Comments on testing: ___________________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
P
LEASE SKETCH ON THE FOLLOWING PAGE A DIAGRAM OF YOUR SYSTEM
,
CONNECTIONS
OR INCLUDE A FORMAL CONNECTION SCHEMATIC WHEN
SENDING THIS CHECKLIST TO
14
G
AMATRONIC
Operation
I n i t i a l S t a r t u p
G
AMATRONIC
E
I
L
LECTRONIC
NDUSTRIES
TD
Requirement
+384 V and – 384 V
Twelve x 15 A fuses
Ten x 20 A fuses
Check diagram for proper
connection
+432 Vdc and –432 Vdc
Match specifications
Match installed batteries
Should be accurate
Obtain from system admin
T e s t i n g
230V or as specified
230V or as specified
Phase-to-phase and phase-to-
neutral voltage no less than 2%
below no-load values
Output current is within system
specifications
L1= ___A; L2= ___A; L3=___A
No alarms or fault indications
Reach controller from browser
Can send SMS from Wing
.
POWER + SA: 20, 30, and 40 kVA, Release 2.1
.
Reference
4.3.3 Step 5
4.3.3 Step 6
4.3.3 Step 6
4.3.4.1
0 Steps 1, 2
0 Step 3
6.7.1 Steps 1-8
6.7.2
6.7.3
6.7.4
6.8.1
6.8.2
6.8.3
6.8.3
6.8.4
6.8.5

Advertisement