Before You Get Started; Installation Of Column - Seca 703 Manual

Hide thumbs Also See for 703:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 35

4. BEFORE YOU GET STARTED ...

4.1 Installation of column

The column with the LCD display can be fitted in two
positions, so allowing you to determine the direction in
which the display is legible - facing either towards or
away from the platform.
1. Fit the column cover to the column.
2. Place the column in the recess, facing it in the de-
sired direction.
3. Screw the column to the weighing platform from
underneath.
If necessary, lay the scales down carefully on their
side to tighten up the screws.
4. On the underside of the weighing platform connect the
plugs of the display cable as shown in the diagram.
ATTENTION!
Malfunction with any error in installation
If cables are strained during fitting, e.g. bent
tight or with plugs kinked, this may result in mal-
functions and failure of the display.
− Make sure that all cables are laid so as to pre-
vent them from being bent too tight or the
plugs kinked.
− Ensure strain relief by laying all cables in the
relevant holders.
5. Secure cables in their holders.
6. Then place the scales upright again.
7. Slide the column cover right down until it engages
on the weighing platform.
Before you get started ... • 43
English

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents