Test Pin - Panasonic U-8MF2E8 Service Manual

3-way vrf system
Table of Contents

Advertisement

7. Test Pin

When the test pin on the outdoor unit control PCB is short-circuited, each part can be operated individually.
After turning OFF the main unit power, short circuit the test pin (CN022, WHT), then turn the power back ON.
Output is performed in the sequence shown in the table below, for 0.5 seconds each.
Output
1
Relay RY12
2
Relay RY13
3
Relay RY15
4
Relay RY16
5
Relay RY4
6
Relay RY6
7
Relay RY18
8
Relay RY19
9
Relay RY11
10
Relay RY10
11
Relay RY8
12
Relay RY1
13
Relay RY2
14
Relay RY17
15
Relay RY20
Operation
Suction valve 1 (SCV1)
Suction valve 2 (SCV2)
Discharge valve 1 (DCV1)
Discharge valve 2 (DCV2)
Bypass valve (BPV)
Oil recovery valve (ORVR)
Pressure balance valve 1 (PBV1)
Pressure balance valve 2 (PBV2)
Refrigerant balance valve (RBV)
Refrigerant adjustment valve (RCV)
Save valve (SAVE)
Crankcase heater 1 (CH1)
Crankcase heater 2 (CH2)
Discharge valve 1A (DCV1A)
Discharge valve 2A (DCV2A)
5 - 29
3WAY SYSTEM
Trouble Diagnosis
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents