Before the converter with connected PROFIBUS board is switched on, you should
plug either the standard display panel (SDP), a basic operator panel (BOP) or an
'Advanced Operator Panel' (AOP) into the PROFIBUS board.
The PROFIBUS optional board may only be installed when the converter power
supply is disconnected.
A minimum requirement for starting up the PROFIBUS optional board is the
PROFIBUS address setting.
Two methods of setting the PROFIBUS address:
Via the seven DIP switches on the communication board or
via parameter "P0918".
1 PROFIBUS address switch (DIP switch)
2 (for Siemens internal use only)
Fig. 5-1
PROFIBUS Optional Board
6SE6400-5AK00-0BP0
View of DIP switch
Operating instructions
37