Needle Timing To Hook - ELNA 6125QC Service Manual

Table of Contents

Advertisement

Needle Timing to Hook

When the hook point meets with the right side of the needle, the height of needle point from its lowest and
left most position should be 3.25-3.55 mm.
Adjustment procedure:
1. Select the straight stitch " " and set the stitch width control at "6.5".
2. Remove the presser foot, needle plate (A) and bobbin holder (B).
3. Remove the front cover (See page 8.).
4. Turn the handwheel to bring the needle to its lowest position.
5. Loosen the 2 setscrews (C) in the lower shaft gear.
6. Turn the handwheel to raise the needle bar 3.4 mm from the lowest position.
7. Rotate the lower shaft gear until the hook point meets the right side of the needle, while holding the
handwheel in place.
8. Tighten the setscrews (C).
9. Attach the front cover.
10.Attach the bobbin holder, needle plate and presser foot.
Setscrews
Mechanical Adjustment
Needle plate (A)
Hook
Bobbin holder (B)
3.25-3.55 mm
Lower shaft gear
19
Hook point meets
right side of needle.
Setscrews (C)

Advertisement

Table of Contents
loading

This manual is also suitable for:

6019qc

Table of Contents