Download Print this page

Technical Data; Operation - EINHELL BG-PW 48 Operating Instructions Manual

Petrol water pump

Advertisement

Anleitung_BG_PW_48_SPK1:_
GB

4. Technical data

Engine type:
4-stroke engine; air-cooled
Max. engine output:
Displacement:
Idle speed of engine:
Maximum engine speed:
Fuel:
Tank capacity:
Oil volume / type:
Spark plug:
Max. intake head:
Max. pumping rate:
Max. delivery head:
Max. pressure:
Weight (with empty tank):
Intake/Discharge connector:
2" / 1.25"/ 1" thread connector
L
sound power level:
WA
L
sound pressure level:
pA
5. Before starting
As a basic principle, we recommend the use of a
preliminary filter and a suction set with suction hose,
suction strainer and non-return valve, in order to
prevent long priming periods and unnecessary
damage to the pump as a result of stones and solid
foreign bodies.
5.1 Preparing the machine
Fill the engine with engine oil (see also point
7.2.1 Oil change).
Fill the tank with petrol.
Place the machine on a flat, firm surface.
8
25.06.2008
9:34 Uhr
5.2 Connecting and routing the intake and
4.8 kW / 6.5 bhp
196 cc
1500 rpm
3600 rpm
Regular unleaded petrol
3.6 l
600 mL SAE#30
L7TC
6 m
35000 l/h
26 m
2.6 bar
28 kg
2" hose connection

6. Operation

The pump must be filled with the transport fluid at the
95 dB
filler neck (Figure 3 / Item 2) before the engine is
75 dB
started.
Note: We advise that you install a non-return valve in
the intake line and fill it with water before you start
the machine for the first time.
6.1 Starting the engine
1. Set the On/Off switch (Figure 1 / Item 6) to "ON".
2. Set the petrol cock (Figure 4 / Item 8) to the "ON"
3. If the engine is cold, set the choke lever (Figure
4. Move the throttle lever (Figure 4 / Item 10) to the
5. Pull the starter cord (Figure 4 / Item 7) until the
6. When the engine has been running for approx.
If the engine is warm, leave the choke lever in the
"Run" position when starting.
Explanation of the positions of the throttle lever
(Figure 4 / Item 10):
"Tortoise":
Engine in idling
"Hare":
Maximum delivery rate
Seite 14
discharge lines
Connect the intake line to the intake connection
(Figure 3 / Item 11) and the discharge line to the
discharge connection (Figure 3 / Item 3).
Position the intake line so that it rises from the
water withdrawal point to the pump. It is essential
that you do not route the intake line above the
height of the pump. Air bubbles in the intake line
will slow down and prevent the intake process.
Install the intake and discharge lines in such a
way that they do not exert any mechanical
pressure on the pump.
The intake valve should be low enough in the
water to ensure that if the water level falls, the
pump will not run dry.
A leaking intake line will draw in air and therefore
not draw in any water.
Do not draw in any foreign bodies (sand, etc.). If
necessary install an initial filter.
position.
4 / Item 9) to "Choke".
center position.
engine starts.
30 seconds, move the choke lever to "Run".

Hide quick links:

Advertisement

loading