Chrysler neon 1997 Service Manual page 1307

Table of Contents

Advertisement

14 - 20
FUEL SYSTEM
REMOVAL AND INSTALLATION (Continued)
(5) From the engine compartment, rotate the
throttle lever forward to the wide open position and
install cable clasp (Fig. 42).
(6) Install throttle ontrol shield (Fig. 38). Tighten
to 5.6 N·m (50 in. lbs.).
SPECIFICATIONS
TORQUE SPECIFICATION
DESCRIPTION
Accelerator Pedal to Dash Nuts . 12 N·m (105 in. lbs.)
Fuel Pump Module Locknut . . . . 55 N·m (40 ft. lbs.)
Fuel Tank Strap Bolts . . . . . . . 23 N·m (250 in. lbs.)
Fuel Rail Bolts . . . . . . . . . . . . . 23 N·m (195 in. lbs.)
Ignition Coil Mounting Bolts . . . 11 N·m (95 in. lbs.)
Intake Manifold Bolts . . . . . . . . 11 N·m (95 in. lbs.)
Throttle Control Shield . . . . . . . 5.6 N·m (50 in. lbs.)
PL
TORQUE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Neon

Table of Contents