Three-Phase Connection - Electrolux T5675 Installation Manual

Hide thumbs Also See for T5675:
Table of Contents

Advertisement

9.3 Three-phase connection

Demount the cover panel from the supply unit. Connect the earth and other wires as shown.
3AC
3AC
3NAC
3NAC
When the installation is completed remount the cover panel and check:
• That the drum is empty.
• That the machine operates by connecting the power to the machine and start a program with heat.
Electrical connection
L2
L3
L1
L3
N
L1
L2
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents